freshuaejobs.com

132 Jobs in Masirah, Ash Sharqiyah South, Oman
Advertisements

Business Development Executive (Full time / Part time)

Masirah, Ash Sharqiyah - JOB VACANCY BUSINESS DEVELOPMENT EXECUTIVES for starting new business in Sultanate of Oman. Company.. TSP GROUP International .. since 1975 [INDIA, UK, IRELAND, US,SINGAPORE, SWEDEN, OMAN,QATAR ] Timings Flexible for 1st 3 MONTHS.[part time/full time] Experience Required Marketin...
-Source (careerjet.ae)

Contracts Engineer Civil

You will be Responsible for Coordinating with the Contractors Vendors Preparing technical commercial offers proposals along with handling tender contract billing related formalities documentation
-Source (Mitula)
Advertisements

Superintendents Civil SKD 225

Urgently required for a leading Korean Engineering Construction Company involved with Polysilicon Plant Construction Refinery Petrochemical Oil Gas Projects in Saudi Arabia B E in Civil Engineering with minimum 5 to 10 years or Diploma with minimum 10 to 15 years experience in Civil works for Refinery Petrochemical Oil Gas EPC Projects Experience in Gulf Korean Companies preferred CHENNAI OFFICE Asiapower Overseas Employment Services28 Aarti Arcade 4th Floor 86 Dr Radhakrishna Road Mylapore Chennai 600004Fax No 044 28111390Email chennai asiapoweroverseas com DELHI OFFICE Asiapower Overseas Employment ServicesBldg no 9 Main Road Sant Nagar 2nd Floor East of Kailash Above Dhaba 61 Milestone New Delhi 110 065 Fax No 011 26231563Email id delhi asiapoweroverseas comKOCHI OFFICE C O Jomer Arcade 3rd Floor South Junction Chittoor Road Opp Girls High School Kochi 682016 Fax 0484 4044520Email kochi asiapowerltd com
-Source (Mitula)

Project Head AGM DGM

Understanding Business Requirement Identification and Acquisition of land for setting up industries Developing facility Design and Construction of facility and factory buildings Source equipment for manufacturing needs and establish production processes with vision of flexible manufacturing solution Project Study Evaluation Budgeting Dev of land Legal processing Finalisation of BOQs Drawings finalisation Vendor Sourcing Tendering Negotiation Ordering Execution Tracking with time and cost complete co ordination follow up preparation on daily progress with on site engg Status report generation use of MS Project tool testing of new machines lines training and handing over Conceptualize design Design Process for Business requirement Simulate Process and sample studies Develop Equipment Design for Process Coordinate with Consultants for design development Identify facility requirement Estimate cost requirement Schedule Project duration Obtain approvals for Project Conceptualize processes design estimate execute monitor and control projects Design and execute projects for all utilities Set pathways processes for flow of Material product people scarp etc Lead the team of Managers and Engineers to succeed in executing projects Provide turnkey solutions for new facilities facility enhancementsPlanning Scheduling Project break ups Element plans Prepare Specification for equipment utilities Building Contract finalization Architect Builder Schedule project execution activities Budget projections Space planning Facility Master planning and project executionExecution Trial Approvals from Statutory bodies Blueprint development Vendor Identification Negotiation Equipment Sourcing Leading Execution Team to achieve quality and timelines Contract Management Project tracking for timelines Deviation recording consequence analysis Project meetings Expenses tracking Safety hazards studies Environmental Health risk assessments Ensure Safe practices and fail safe gadgets Process Hazard Assessment Analysis PHA for new process and equipment Trial run Capacity proving Deviation analysis Equipment Capitalization Key skills Project Expertise Low Cost Project set up along with Electrical Mechanical Civil Utilities Green Field Project Set up Legal comp Tendering Source identification Comparing Negotiating and awarding the Work Selection of vendor layout planning end to end conception and hand over to operations Acting as a link with Supply chain Finance agencies involved for keeping the show on Experience in Quality systems ISO 9000 Environment Management system ISO 14001 Safety Management system OHSAS TPM Six Sigma Constant cost reduction at supplier end to cater the need based on value of items to be executed Caring out Process Audits for Compliance of procedures and course correction Preparing Defect identification n solution using CAPA Corrective Preventive action Initiate deployment of 5S and Kaizen activity at unit level Project conception Ordering Procurement Techno commercial selection of equipment and Budgeting Monitoring the progress of the project against the financial indices budget Co ordinating with contractors Architectures Structure Engineers and PEB vendors Layout planning end to end conception and making site ready for operations Complete project procurement well within the approved budget
-Source (Mitula)

AGM Civil

Planning scheduling estimating preparation of construction schedule Documentation rate analysis Preparation of departmental bills extra items proposals for deviation works Proper verification of the sub contractor s bill Dealing independently with clients and consultants at site To ensure that the work is carried out as per the high standards and maintain the proper quality and check list of work as per the ISO requirements Responsible for increasing profitability To ensure the various safety measures taken at site Weekly monthly progress report at site
-Source (Mitula)

Project Director Head of Delivery

Reporting directly to the top management the incumbent will be responsible to achieve the defined objectives for a specific project s within the terms and conditions of the project s whilst implementing Company policy and procedural requirements
-Source (Mitula)

Manager Erection and Commissioning

1 Taking care of erection commissioning of shot blasting machines 2 To manage the team of Engineers technical persons troubleshooting of faults and commissioning of shot blasting machines 3 Offering after sales technical support solutions once a product has been sold 4 Pre commissioning checking acceptance 5 Basic knowledge of equipment trial operation6 Co ordination with customer for commissioning activity scheduling 7 Trouble Shooting 8 Attending meeting with customer on various technical commissioning related issues and collecting commissioning certificate 9 To work with QA QC to resolve quality issues 10 Assist in all aspects for the development of a commissioning plan schedules budgets QA QC safety etc 11 Attend client project meetings and act as spokesperson for company 12 Provide periodic reports on activities to Project Manager maintain site daily log and activities record 13 Proper timely communication with all concerned related to that Project 14 Document control Scheduling 15 On time completion of commissioning activities 16 Regular Reporting Contractual communication as when required
-Source (Mitula)

Immediate Opening for Plant and Machinery Sobha Developers Ltd

Ensuring that all mechanical equipments function smoothly Coordinating with Stores PQS and Purchase departments Coordinating in shifting of equipments and spares Coordinating with engineers and supervisors during periods of heavy erection and assembly Certification of bills Reporting of work progress to higher authorities Ensuring that all maintenance is carried out as per maintenance schedule Ensuring that all safety protocols are followed Future planning expansion of machine Selection of new generation machine Provide support to execution team Evaluate productivity of machine Production Maintainence of Concrete Batching plant CP 30 Know Sany 50tn Crane Mobile tower crane p h 320 Watching observation about mechanical Parts in Stores consumables Restriction of Diesel for all machinery running hours Find out the Problems in all type of machinery Seeking perfect us age of all Hired machinery in site Dg Set concrete pump jcb 300 hours after service Preparation of Daily project Review DPR in fuel consumption Maintainence of 125KVA 250KVA 320KVA DG sets Preventive maintainence to avoid Break downs of Construction Machinery Processing the cost of plant machinery production Physical verification of Bar bending Bar Cutting Vibrators Niddles machines Crew Management low cost maintainence of equipment Maintainence of motors 1HP to 60 HP Sub mercible pumps check verify the condition of machinery Excavators Dozer Hydra Mobile crane Tower crane transit mixture Truckts Concrete pump welding machines calculate AVG per hour consumption
-Source (Mitula)

project manager Oil and Gasupstream

Responsible for translating customer requirements into detailed project plansshared with stakeholders involved driving internal execution to meet targets Responsible for strategic planning execution of projects must exposure in upstream project
-Source (Mitula)

Program Manager Manager Operations

Hands on Experience in managing Offshore engineering Design Centers with diversified expertise in Design Engineering and Offshore Onsite Engineering Services Operations Competent in the activities related to Proposals Bids
-Source (Mitula)
Page No: 1